Projects and upgrades

Phil has been working on installing the Solar Panels on the hard Bimini.  He attached 25 ft of 12 gauge boat wire (coiled up on top of the panels) so that he can wire it up to the controller once everything in on the boat.  We have to disassemble it to get it back on the boat, but at least the hard part (I hope) is done.  I think it looks really nice and look forward to not having to run the engine as often.   On an interesting note, the panels were making electricity from the lights in the storage unit.

Solar Panels installed on Binimin

Solar Panels installed on Bimini

 

This weekend Phil is planning on painting the bottom.  At last we are to get some warm weather!!

Advertisements

3 thoughts on “Projects and upgrades

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s